3.9MW
Private College, Education

From a 0.2 MW treatment plant array to a 3.9 MW private college system, every project here was developed for an organization that paid nothing upfront.
(01) Featured portfolio
Filter by sector or sort by size. Named case studies, with results in our clients' own words, follow below.
3.9MW
Private College, Education
2.4MW
Elementary Schools, Education
2.4MW
High School, Education
1.7MW
Regional School District, Education
1.4MW
Elementary School, Education
1.2MW
Mining Operation, Commercial
0.7MW
Private College, Education
0.6MW
Township, Municipal & water
0.4MW
Treatment Plant, Municipal & water
0.3MW
Treatment Plant, Municipal & water
2.7MW
Private College, Education
2.0MW
National Retailer, Commercial
1.2MW
Non-Profit, Non-profit
1.1MW
Treatment Plant, Municipal & water
1.0MW
Manufacturer, Commercial
0.3MW
Treatment Plant, Municipal & water
0.2MW
Treatment Plant, Municipal & water
0.2MW
Treatment Plant, Municipal & water
0.2MW
Non-Profit, Non-profit
Showing 19 projects23.9 MW7 states
(02) Case studies
Public results, in our clients' own words, as reported in Keystone's press announcements.

A ground-mounted system on industrial land at a packaging plant owned by Crown Holdings (NYSE: CCK). Keystone financed, developed and owns the system; Crown uses the power under an operating lease, with a Duke Energy rebate lowering capital costs.
“Offsetting one-third of our annual energy usage in our Spartanburg plant is an important achievement.”Bob Harding, Plant Manager, Crown Holdings

Two fully built Illinois education projects, within an hour's drive of each other, cutting one of the schools' largest operating expenses and adding resilience to the local grid.
“Our solar projects will allow education administrators to direct more funding to their students and teachers.”William DePhillipo, Co-Founder, Keystone

Keystone developed, built and financed solar for the wastewater plants of Georgetown and Abingdon. Both cities buy the power under long-term PPAs at a discount to utility rates, worth hundreds of thousands of dollars over each agreement.
“The solar installation brings down our costs for wastewater processing.”Mayor Darin Readnour, City of Georgetown

Flexible, non-standard financing let this non-profit go solar with nothing upfront. The system produced more than 200,000 kWh in its first year, and the savings now fund the JCC's programs.
(03) Footprint
Hover or tap a state to see projects and capacity. Offices in Pennsylvania, Illinois and Virginia, with expansion into Maryland and Maine.
Free feasibility review
Send us twelve months of utility bills and a site address. We'll come back with a system size, an indicative rate and what you could save, with no cost and no obligation.