Built. Running. Saving.

From a 0.2 MW treatment plant array to a 3.9 MW private college system, every project here was developed for an organization that paid nothing upfront.

23.9 MWFeatured portfolio
19Projects
7States

(01) Featured portfolio

Every project, by the numbers.

Filter by sector or sort by size. Named case studies, with results in our clients' own words, follow below.

MA

3.9MW

Private College, Education

NM

2.4MW

Elementary Schools, Education

CA

2.4MW

High School, Education

MA

1.7MW

Regional School District, Education

CA

1.4MW

Elementary School, Education

CA

1.2MW

Mining Operation, Commercial

CA

0.7MW

Private College, Education

NJ

0.6MW

Township, Municipal & water

IL

0.4MW

Treatment Plant, Municipal & water

IL

0.3MW

Treatment Plant, Municipal & water

MA

2.7MW

Private College, Education

CT

2.0MW

National Retailer, Commercial

NJ

1.2MW

Non-Profit, Non-profit

IL

1.1MW

Treatment Plant, Municipal & water

SC

1.0MW

Manufacturer, Commercial

IL

0.3MW

Treatment Plant, Municipal & water

IL

0.2MW

Treatment Plant, Municipal & water

NJ

0.2MW

Treatment Plant, Municipal & water

NJ

0.2MW

Non-Profit, Non-profit

Showing 19 projects23.9 MW7 states

(02) Case studies

The stories behind the MW.

Public results, in our clients' own words, as reported in Keystone's press announcements.

Ground-mounted solar array
ManufacturingSpartanburg, SCOperating lease

Crown Holdings: largest leased array in South Carolina

A ground-mounted system on industrial land at a packaging plant owned by Crown Holdings (NYSE: CCK). Keystone financed, developed and owns the system; Crown uses the power under an operating lease, with a Duke Energy rebate lowering capital costs.

System
924.6 kW DC
Modules
2,680
Output
~1,310 MWh/yr
“Offsetting one-third of our annual energy usage in our Spartanburg plant is an important achievement.”Bob Harding, Plant Manager, Crown Holdings

Read the announcement

Solar on a college campus at dusk
EducationIllinois

Augustana College & Abingdon-Avon High School

Two fully built Illinois education projects, within an hour's drive of each other, cutting one of the schools' largest operating expenses and adding resilience to the local grid.

Augustana
1.35 MW DC
Buildings
4
Abingdon-Avon HS
750 kW DC
“Our solar projects will allow education administrators to direct more funding to their students and teachers.”William DePhillipo, Co-Founder, Keystone

Read the announcement

Solar array on open municipal land
WastewaterGeorgetown & Abingdon, ILPPA

Two cities, two treatment plants, zero upfront

Keystone developed, built and financed solar for the wastewater plants of Georgetown and Abingdon. Both cities buy the power under long-term PPAs at a discount to utility rates, worth hundreds of thousands of dollars over each agreement.

Georgetown
354 kW · 12%+
Abingdon
208 kW · 18%+
Upfront cost
$0
“The solar installation brings down our costs for wastewater processing.”Mayor Darin Readnour, City of Georgetown

Read the announcement

Rows of solar panels
Non-profitScotch Plains, NJPPA

JCC of Central New Jersey

Flexible, non-standard financing let this non-profit go solar with nothing upfront. The system produced more than 200,000 kWh in its first year, and the savings now fund the JCC's programs.

System
223.56 kW
Year one
200,000+ kWh
Savings
20%+ / yr

Read the announcement

(03) Footprint

Seven states and growing.

Hover or tap a state to see projects and capacity. Offices in Pennsylvania, Illinois and Virginia, with expansion into Maryland and Maine.

  • Featured projects
  • Keystone office
  • Expansion market
AK ME VT NH WA ID MT ND MN IL WI MI NY RI MA OR NV WY SD IA IN OH PA NJ CT CA UT CO NE MO KY WV VA MD DE AZ NM KS AR TN NC SC DC OK LA MS AL GA HI TX FL

Free feasibility review

Let's put your roof, land or lot to work.

Send us twelve months of utility bills and a site address. We'll come back with a system size, an indicative rate and what you could save, with no cost and no obligation.

Call Start a project